# Theological Quarterly_St. Louis Missouri_January 1898_S111 # Machine transcription, uncorrected — CHI Digital Archive (demonstration) THEOLOGICAL REVIEW. alata tate an entire change of construction. A trifling change, —the removal of a pier, or opening, or the change in location of a partition wall or doorway, if only a few inches, —may not apparently affect anything; but when the roof is reached, is found that a main support is removed, and the very nature of the roof construction will not ac- commodate itself to the change, necessitating an entire change in this, which will necessitate many others. Conditions may prevail, which will make this and all resultant modifications complicated and expensive: Thus while the change itself may be insignificant, the consequential and incidental expense and damage may spoil the building and materially increase the cost without corresponding benefit. Especially guard any effort on the part of builders to induce changes; they frequently desire, —especially when working under contract, —to open a door fora bill of extras. Changes may be necessary, and may be advisable in some instances. When considered however they should be considered under the advice and counsel of the architect. An efficient, careful and experienced architect thoroughly considers or should consider every detail of construction, practically erecting the house in his mind, during the development of the plans, and has provided for every emergency; consequently the reasons for all things may not be apparent in the beginning, but eventually it will be found that there is an object or purpose for every part. Therefore the plans of the architect should be adhered to literally; should anything be vague or misunderstood, or should an error be discovered, he should be applied to, for an explanation or correction, as the error or discrepency may only be an apparent one. Before deciding on any change that may be deemed necessary, he should be consulted and requested to arrange for same. Competent and honest contractors should be selected, as no amount of skill or zeal on the part of the architect or superintendent can compensate for a lack of efficiency on the part of the contractor or his workmen, a high standard of work may be required which the workmen are not competent to execute and may not even comprehend. Doing the best they can is not always a sufficient excuse. The contractor should be required to employ efficient workmen. Oftentimes more time is spent in covering up bad work than would be necessary to do good; all these matters should be considered in a contract. When the drawings are fully prepared, various contractors are invited to submit proposals for the execution of the work in accordance with the same and the specifications accompanying. In this,