1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128

Scan: Internet Archive, from the Graduate Theological Union's copy (one item per issue).

⤓ Download page image (full resolution)

Transcription machine transcription, uncorrected

⤓ Download .txt · copy text

THEOLOGICAL

REVIEW.

iLO}

matter of cost is largely one of opinion.
Qualities of material may
be carefully computed, quality and character of same are determined
by the specifications, all having a market value.
Zhe exact amount
of labor required is however largely a matter of opinion or Cconjecture, although same may be approximately estimated, while the price
of labor is determined or definite.
One contractor may. possess advantages and facilities not possessed by others, and may calculate on larger profits.
All these
varying conditions will result in varying prices.
Hence it need be
no surprise to receive proposals from equally responsible and efficient
men varying as much as fifty per cent.
If contractors with fixed
conditions thus vary, it need occasion no surprise if the architect
should.
He may be over-sanguine in his ability, or hope for favorable conditions and estimate accordingly, or he may be conservative
and anticipate the worst and thus estimate high.
His experience,
knowledge of conditions and prevailing prices, should enable him to
arrive at as conservative an estimate as can be made in the preliminary stages.
If it should develop that no proposal can be secured
within the limit, the question will then arise, What modifications are

possible without detriment? The fertility of resource of a competent
architect is generally competent to adjust this without difficulty.
Whatever is determined on should be thoroughly indicated,
agreed to and incorporat<d in the contracts, so that no further change
will be required. ... pp. 43 ff.
In soliciting proposals for the erection of any building, it is presumed that it is the intention of the owners to proceed with the work,
and that the proposal of one of those solicited will be accepted,—
presumably the lowest; —and unless the right of rejecting any or all
proposals is stipulated, the owner will be liable to the party who submits the lowest proposal, for damages for refusal to enter into contract. This responsibility will not pertain, however, in the case of a
proposal submitted which has in no way been solicited, or consideration implied by acceptance. A proposal should not be rejected without reason,

especially if it should

be the lowest.

The

form of con-

tract which most nearly covers all contingencies, is known as the
“Standard form,’’ and is generally accepted and used in practice

throughout the United States.

This was formulated by Committees

from the American Institute of Architects and the National Association of Builders, with legal advice, and is considered the best form of

building contract in use.
The law presumes that the party contracting to erect a building
according to provisions of a contract, drawings and specifications,
8