Collection › Theological Quarterly (St. Louis, Missouri) › Volume 2 › Page 111

Theological Quarterly St. Louis, Missouri — January 1898, Page 111

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128

Scan: Internet Archive, from the Graduate Theological Union's copy (one item per issue).

⤓ Download page image (full resolution)

Transcription machine transcription, uncorrected

⤓ Download .txt · copy text

THEOLOGICAL

REVIEW.

alata

tate an entire change of construction. A trifling change, —the removal of a pier, or opening, or the change in location of a partition
wall or doorway, if only a few inches, —may not apparently affect
anything; but when the roof is reached, is found that a main support
is removed,

and the very nature

of the roof construction

will not ac-

commodate itself to the change, necessitating an entire change in
this, which will necessitate many others.
Conditions may prevail,
which will make this and all resultant modifications complicated and
expensive: Thus while the change itself may be insignificant, the
consequential and incidental expense and damage may spoil the

building and materially increase the cost without corresponding
benefit.
Especially guard any effort on the part of builders to induce
changes; they frequently desire, —especially when working under
contract, —to open a door fora bill of extras. Changes may be necessary, and may be advisable in some instances.
When considered
however they should be considered under the advice and counsel of
the architect.
An efficient, careful and experienced architect thoroughly considers or should consider every detail of construction, practically
erecting the house in his mind, during the development of the plans,
and has provided for every emergency; consequently the reasons for
all things may not be apparent in the beginning, but eventually it
will be found that there is an object or purpose for every part. Therefore the plans of the architect should be adhered to literally; should
anything be vague or misunderstood, or should an error be discovered,
he should be applied to, for an explanation or correction, as the error
or discrepency may only be an apparent one.

Before deciding on any change that may be deemed necessary,
he should be consulted and requested to arrange for same.
Competent and honest contractors should be selected, as no amount of skill

or zeal on the part of the architect or superintendent can compensate
for a lack of efficiency on the part of the contractor or his workmen,
a high standard of work may be required which the workmen are not
competent to execute and may not even comprehend. Doing the best
they can is not always a sufficient excuse.
The contractor should be
required to employ efficient workmen. Oftentimes more time is spent
in covering up bad work than would be necessary to do good; all

these matters should be considered in a contract.
When the drawings are fully prepared, various contractors are
invited to submit proposals for the execution of the work in accordance with the same and the specifications accompanying.
In this,