Collection › Theological Quarterly (St. Louis, Missouri) › Volume 2 › Page 115

Theological Quarterly St. Louis, Missouri — January 1898, Page 115

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128

Scan: Internet Archive, from the Graduate Theological Union's copy (one item per issue).

⤓ Download page image (full resolution)

Transcription machine transcription, uncorrected

⤓ Download .txt · copy text

THEOLOGICAL

REVIEW.

rales)

Those with experience know, that by some mysterious process
of.calculation things valued afterward always cost more than if contracted for beforehand: likewise, the value of work added is always
greater than for the same work omitted. A bill of extras is a bill of
horrors to any owner or conscientious

architect and is to be avoided,

complete plans and specifications should do this.

It is well to stipu-

late in contract,

for any extras, un-

“‘that no allowance will be made

less the same shall have been done in pursuance of a written contract or order signed by the architect or superintendent, and the price
agreed upon previous to execution and endorsed on said order.’’
It is an established and well settled fact, that an owner can recover damages

for inferior work or materials, but that the contractor

cannot recover for better materials or work than specified, without
the direction or consent of those in authority; supplying such work
and materials being voluntary and not obligatory. pp. 96 f.
Where a building contract makes no reference to old structures
to be removed, standing upon the land, the materials become the
property of the builder, and the owner is not entitled to allowance
therefor.
Nearly every locality has its own ordinances or laws regarding
the use of highways and streets for or during building operations.
Also certain general or special building laws; non-compliance constitutes a nuisance or a violation.
The owner may be responsible
for abatement, damages or neglect according to the nature of con-

tract. Where the builder contracts to do the entire work, employing
his own mechanics and assuming entire charge over the construction of the building, the owner cannot be held liable for injuries
caused by the builder during the progress of the work. p. 99.
As there is always a certain amount of responsibility which
cannot be avoided, it is essential that honest competent contractors
should be selected, and not allow the price to alone determine.
An
owner

cannot

avoid

less, incompetent,

responsibility

or dishonest

who

knowingly

contractor,

accepts

a care-

and the fact that he em-

ploys an architect or superintendent to oversee the work will not
relieve him.
No amount of supervision will make an incompetent
man competent, or a dishonest man honest. p. 99.

It may be proper to mention in this connection another
work on church architecture, published some years ago in

Europe.
It is ‘‘Das evangelische Kirchengebaude.
Ein
Ratgeber fiir Geistliche und Freunde kirchlicher Kunst
herausgegeben in Verbindung mit Baurat Dr. Mothes in

nos
ale